29 November,2022 06:13 PM IST | Mumbai | mid-day online correspondent
Pic/MMRDA
The MMRDA is integrating Mumbai Metro Network for which a new foot over-bridge (FOB) was completed in record time. The FOB will connect two important Metro Lines. This FOB will help the passengers to interchange Mumbai Metro Line-7 (Gundavali Station) to Metro Line-1 (Western Express Highway Station) and vise-versa, the MMRDA said in an official statement.
A total 58-meter long and 4 meter to 8 meter wide superstructure of FOB was completed in record 15 days, it said.
ALSO READ
Ajit Pawar-led NCP to contest MLC election from Mumbai Teachers constituency
Shiv Sena's Shivaji Shendge to contest polls from Mumbai Teachers' constituency
Mid-Day Top News: Maharashtra assembly polls likely only after Diwali and more
Special | Maharashtra assembly elections: Who’s the real NCP in Mumbra-Kalwa?
Maharashtra assembly elections: Want unity, not CM post, says Uddhav Thackeray
The total steel quantity used in this FOB is around 340 Metric Tonnes (MT) including reinforcement and structural steel. MMRDA constructed this FOB by overcoming hurdle like shifting of utility lines, the MMRDA said.
Also Read: Vistara to merge with Air India by March 2024: Singapore Airlines
The junction near Gundavali Metro Station is very crowded, the new FOB will provide commuters hassle free interchangeable connectivity between two metro lines.
"The infrastructural work on phase- 2 of Metro Line -7 and Metro Line- 2A is Completed. Both the lines will be in service soon after the CMRS inspection", said S.V.R. Srinivas, Metropolitan Commisioner, MMRDA.