07 June,2023 05:58 PM IST | Mumbai | mid-day online correspondent
Representative image/iStock
The Brihanmumbai Municipal Corporation (BMC) on Wednesday said a trolley lift of about length 150 ft. of an under-construction high-rise building broke and fell on the nearby hutments.
According to the BMC officials, the incident was reported at 3.46 pm on June 7 by Mumbai Fire Brigade.
The indent happened at the Deserva building, Ashok Nagar near Vashi Naka.
"Goods carrying crane of about length 150 ft. of an under-construction high-rise building was broken and fallen on nearby two to three hutments. At least five to six people were reported to be injured by the locals," said the BMC official.
ALSO READ
Mumbai lakes providing drinking water reach 98.02 per cent capacity
Mumbai weather update: IMD forecasts moderate rainfall for the city
Maharashtra CM Shinde participates in Ganesh idol immersion programme in Thane
Ganesh Visarjan 2024: 62,569 Lord Ganesha idols immersed till 12 am, says BMC
Mumbai lakes supplying drinking water at 98.15 per cent capacity
"23-year-old Ashutosh Mishra suffered a minor injury and is in stable condition," added the BMC official.