08 April,2024 06:58 AM IST | Mumbai | A Correspondent
The new bridge being constructed dangerously close to the residential building
Another marvel in the city after Andheri's Gokhale bridge? The new Tilak bridge under construction in Dadar East is abutting the adjacent 89-year-old Vishnu Niwas building, raising concerns among activists about its proximity and safety. Activist Zoru Bhathena shared pictures of the bridge on social media, calling it another engineering marvel after the Gokhale bridge. "This is concerning. How can they build so close to a residential building? Also, the beam appears to pass under a part of the building, what are the implications here?". "This could turn out to be a bigger problem than the Gokhale bridge. I anticipate involvement from institutions like IIT and VJTI soon," expressed another activist.
Also Read: Dive into the graveyard beneath Minara Masjid
Considering past experiences of traffic disruptions due to bridge closures, authorities are constructing the new bridge parallel to the existing one without shutting down the old bridge. Demolition of the old bridge will only occur once the new one is operational. The Maharashtra Rail Infrastructure Development Corporation (MRIDC) and the BMC are jointly undertaking this project. The new bridge, constructed using a cable-based structure, will be completed in two phases. It will span 663 metres in length and 16.7 metres in width, featuring 190-metre cables over the bridge area. The existing Tilak bridge dates back to 1925, nearly a century ago.
ALSO READ
Ganeshotsav 2024: 5 famous Ganpati pandals one must visit in Mumbai this year
Mumbai: Gokhale bridge second girder finally launched, lowering to begin soon
BMC completes transfer of girder from southern side of Gokhale Bridge
This restaurant in Andheri serves food from Himachal Pradesh, Nepal, China
Dating app scam probe: Two city clubs get notices for duping men on dating apps
In response to concerns about the bridge's proximity to the building, MRIDC officials stated that they are following the approvals received from the BMC. "The foundation lies within the road line area, and the structure aligns with the General Arrangement Drawing (GAD) approved by the BMC. The BMC is both a funding and approving agency for the cable-stayed ROB at Dadar Tilak. As the foundation falls under BMC jurisdiction, Railways may not assume responsibility since the building falls within the BMC's purview. It appears the building may be undergoing redevelopment, possibly by MHADA, but we are not sure about it," an official said. Despite attempts, BMC officials could not be reached for comment.
663 mtrs
Length of the bridge
16.7 mtrs
Width of the bridge
1925
Year Tilak bridge was built