Updated On: 01 February, 2025 07:02 AM IST | Mumbai | Team mid-day
Locals say that if this road were opened first, the pressure on traffic after closure of the Prabhadevi road would be eased to a great extent.

An aerial view of the century-old Elphinstone road overbridge on January 31. Pic/Sayyed Sameer Abedi
Even as the Mumbai traffic police are still mulling over the logistics and dates of closure of the arterial Elphinstone bridge, taking into consideration all demands and appeals, Dadar residents have reminded the authorities of an earlier planned “development project” road, crossing over the rail lines, between Dadar and Parel-Prabhadevi stations. Locals say that if this road were opened first, the pressure on traffic after closure of the Prabhadevi road would be eased to a great extent.

A 3D representation of the new structure. The bottom deck will retain east-west connectivity while the upper one will be linked to the Atal Bihari Vajpayee Sewri–Nhava Sheva Atal Setu