Updated On: 11 May, 2025 11:30 PM IST | Mumbai | Rajendra B. Aklekar
Reay Road bridge is city’s first cable-stayed road overbridge and has been one of the fastest to be completed, as the older one was demolished in February 2022 and the new one completed in December 2024 within a period of two years. It had, however, to wait nearly six months for inauguration

The new Reay Road bridge has six lanes and a footpath for pedestrians
The Reay Road bridge in Mumbai will be inaugurated by Maharashtra Chief Minister Devendra Fadnavis at an official ceremony on May 13 evening.
From the site, another road overbridge above railway lines at Titwala will also be opened remotely.