Home / Mumbai / Mumbai News / Article / Panvel-Karjat corridor gets 2.6 km tunnel to cut Mumbai commute time

Panvel-Karjat corridor gets 2.6 km tunnel to cut Mumbai commute time

A record 2.6-km tunnel on the Panvel-Karjat corridor aims to ease Central line pressure, cut commute times, and plug Navi Mumbai’s growing airport zone into the suburban network

Listen to this article :
Construction of the Wavarle tunnel on the Panvel-Karjat suburban corridor. Pics/by special arrangement

Construction of the Wavarle tunnel on the Panvel-Karjat suburban corridor. Pics/by special arrangement

Mumbai’s suburban railway network is set to get its longest tunnel, the 2.639-km Wavarle Tunnel (Tunnel-2), being built on the Panvel-Karjat corridor under the Mumbai Urban Transport Project Phase 3.

The tunnel is a key component of the 29.6-km double-line project aimed at easing congestion on the Central Railway, cutting travel time between Mumbai and Navi Mumbai-Raigad, and improving connectivity near the upcoming Navi Mumbai International Airport.

Trending Stories

Latest Photoscta-pos

Latest VideosView All

Latest Web StoriesView All

Mid-Day FastView All

Advertisement