Home / Mumbai / Mumbai News / Article / Phase-1 of Thane-Wadala Metro Line-4 to open by December

Phase-1 of Thane-Wadala Metro Line-4 to open by December

The Green Line will connect Wadala to CSMT in the south and extend to Mira Road in the north; phase 1 spans 4.4 km covering four stations — Gaimukh, Govaniwada, Kasarvadavali, and Vijay Garden

Listen to this article :
CM Devendra Fadnavis, Dy CM Eknath Shinde and Minister Pratap Sarnaik flagged-off the trial run from Gaimukh Metro station, Thane West, on Monday. PIC/ SATEJ SHINDE

CM Devendra Fadnavis, Dy CM Eknath Shinde and Minister Pratap Sarnaik flagged-off the trial run from Gaimukh Metro station, Thane West, on Monday. PIC/ SATEJ SHINDE

THE Mumbai Metropolitan Region Development Authority (MMRDA) on Monday successfully conducted the technical inspection and trial run on the priority section of the Green Line 4 Metro. Thane's first metro — Metro Line 4 and 4A — connects the regions of Mira-Bhayandar to Wadala via Gaimukh and Kasarvadavali.

It was flagged-off by Chief Minister Devendra Fadnavis, along with Deputy Chief Minister Eknath Shinde, and Maharashtra Transport Minister Pratak Sarnaik.

Trending Stories

Latest Photoscta-pos

Latest VideosView All

Latest Web StoriesView All

Mid-Day FastView All

Advertisement