Home / Mumbai / Mumbai News / Article / Tunnelling for Orange Gate-Marine Drive underground corridor begins today

Tunnelling for Orange Gate-Marine Drive underground corridor begins today

The project, with an estimated cost of Rs 8,056 crore and a completion period of 54 months, involves the design and construction of a nearly 10-km corridor, including around 7 km of underground road

Listen to this article :
Representational Image

Representational Image

Tunnelling work for the ambitious 9.23-km underground road corridor linking Orange Gate on the Eastern Freeway to Marine Drive is set to begin today with the launch of a Tunnel Boring Machine (TBM), marking a major milestone for one of Mumbai’s most complex urban infrastructure projects.

The project, with an estimated cost of Rs 8,056 crore and a completion period of 54 months, involves the design and construction of a nearly 10-km corridor, including around 7 km of underground road. It aims to significantly enhance east-west connectivity, reduce travel time by 15–20 minutes, cut fuel consumption, and help lower air and noise pollution.

Read Next Story
Maharashtra local body elections process complete farce, marked by chaos: Shiv Sena (UBT) in Saamana

Trending Stories

Latest Photoscta-pos

Latest VideosView All

Latest Web StoriesView All

Mid-Day FastView All

Advertisement