Home / Mumbai / Mumbai News / Article / Western Railway restores services; another block scheduled for tonight

Western Railway restores services; another block scheduled for tonight

Train services on Western Railway’s Mumbai Suburban section have resumed following a block for bridge reconstruction. Another block is scheduled tonight, affecting Up and Down Slow and Fast lines.

Listen to this article :
Pic/Satej Shinde

Pic/Satej Shinde

Train services on all lines, including the Up and Down tracks of Western Railway’s Mumbai Suburban section, have been restored following a major block undertaken last night. The block, carried out during the intervening night of 24 and 25 January 2025, was necessitated for the reconstruction of the south abutment of Bridge No. 20, located between Mahim and Bandra stations.

The Western Railway has confirmed that the work was successfully completed within the designated timeframe, ensuring the resumption of train operations on all affected lines. Commuters are advised that another block is scheduled for tonight, 25 January 2025, extending into the early hours of 26 January 2025.

Trending Stories

Latest Photoscta-pos

Latest VideosView All

Latest Web StoriesView All

Mid-Day FastView All

Advertisement