Home / Mumbai / Mumbai News / Photos / In Photos: Mumbai’s first cable-stayed bridge at Reay Road ready, to open soon

In Photos: Mumbai’s first cable-stayed bridge at Reay Road ready, to open soon

Updated On: 17 February, 2025 02:51 PM IST | ronak mastakar

The new Reay Road cable-stayed bridge at Barrister Nath Pai Marg, Byculla (East), Mumbai, is ready for inauguration. (Pics/Satej Shinde)

The new Reay Road cable-stayed bridge at Barrister Nath Pai Marg, Byculla (East), Mumbai, is ready for inauguration. (Pics/Satej Shinde)

1/10

The new Reay Road cable-stayed bridge at Barrister Nath Pai Marg, Byculla (East), Mumbai, is ready for inauguration. (Pics/Satej Shinde)
<p>The new Reay Road cable-stayed bridge at Barrister Nath Pai Marg, Byculla (East), Mumbai, is set to open in February</p>

2/10

The new Reay Road cable-stayed bridge at Barrister Nath Pai Marg, Byculla (East), Mumbai, is set to open in February

<p>The city&rsquo;s first cable-stayed road overbridge at Reay Road station is completed and has become one of the fastest ones constructed over the rail lines. The new bridge has six lanes and a footpath for pedestrians</p>

3/10

The city’s first cable-stayed road overbridge at Reay Road station is completed and has become one of the fastest ones constructed over the rail lines. The new bridge has six lanes and a footpath for pedestrians

<p>The construction work of this cable-stayed bridge was started on Valentine&rsquo;s Day 2022 and has been completed in two years</p>

4/10

The construction work of this cable-stayed bridge was started on Valentine’s Day 2022 and has been completed in two years

<p>The new bridge has been part of a citywide project to upgrade old bridges in the city</p>

5/10

The new bridge has been part of a citywide project to upgrade old bridges in the city

<p>Century-old British-era bridges have been taken up for reconstruction by the Maharashtra Rail Infrastructure Development Corporation (MRIDC) or Maharail, under agreement with the BMC and Railways</p>

6/10

Century-old British-era bridges have been taken up for reconstruction by the Maharashtra Rail Infrastructure Development Corporation (MRIDC) or Maharail, under agreement with the BMC and Railways

<p>The new Cable-Stayed Road Over Bridge will add more aesthetic appeal to the world-class heritage structure</p>

7/10

The new Cable-Stayed Road Over Bridge will add more aesthetic appeal to the world-class heritage structure

<p>Additionally, the Maharashtra Rail Infrastructure Development Corporation (MRIDC) has designed architectural LED lighting on the proposed bridge, which will enhance the aesthetic appeal and improve the safety parameters with a Bridge Health Monitoring System</p>

8/10

Additionally, the Maharashtra Rail Infrastructure Development Corporation (MRIDC) has designed architectural LED lighting on the proposed bridge, which will enhance the aesthetic appeal and improve the safety parameters with a Bridge Health Monitoring System

<p>The bridge will allow traffic movement through the underpass of Barrister Nath Pai Road, and it will also maintain the required vertical clearance for passing of vehicles under the eastern freeway as per Indian Road Congress (IRC) standard</p>

9/10

The bridge will allow traffic movement through the underpass of Barrister Nath Pai Road, and it will also maintain the required vertical clearance for passing of vehicles under the eastern freeway as per Indian Road Congress (IRC) standard

<p>Also, it has been designed to improve the safety parameters with a bridge health monitoring system</p>

10/10

Also, it has been designed to improve the safety parameters with a bridge health monitoring system

Photo of Day

Breaking barriers and building pyramids — Women power in action!

Breaking barriers and building pyramids — Women power in action!

Sashastra Seema Bal’s (SSB) Daredevils team performs during rehearsals for the Republic Day Parade, in New Delhi. PIC/PTI

Advertisement