Home / Mumbai / Mumbai News / Photos / In Photos: Technical inspection of Metro 4 and 4-A from Gaimukh to Vijay Garden

In Photos: Technical inspection of Metro 4 and 4-A from Gaimukh to Vijay Garden

Updated On: 22 September, 2025 12:48 PM IST | Tarun Verma

The first test run of a 10-kilometre section of Thane Metro 4 was successfully conducted on Monday, September 22, marking a major milestone in the city’s rapid public transport development. The trial, attended by Chief Minister Devendra Fadnavis and Deputy CM Eknath Shinde. (Pics/Satej Shinde)

The first test run of a 10-kilometre section of Thane Metro 4 was successfully conducted on Monday, September 22, marking a major milestone in the city’s rapid public transport development. The trial, attended by Chief Minister Devendra Fadnavis and Deputy CM Eknath Shinde. (Pics/Satej Shinde)

1/6

The first test run of a 10-kilometre section of Thane Metro 4 was successfully conducted on Monday, September 22, marking a major milestone in the city’s rapid public transport development. The trial, attended by Chief Minister Devendra Fadnavis and Deputy CM Eknath Shinde. (Pics/Satej Shinde)
<p>Metro Line 4 is set to strengthen the connectivity between Mumbai&rsquo;s eastern and western suburbs, benefiting a wide spectrum of the population, including daily commuters, students, and working professionals.&nbsp;</p>

2/6

Metro Line 4 is set to strengthen the connectivity between Mumbai’s eastern and western suburbs, benefiting a wide spectrum of the population, including daily commuters, students, and working professionals. 

<p>Maharashtra Transport Minister Pratap Sarnaik highlighted the transformative impact of the metro line on the region&rsquo;s transportation landscape.</p>

3/6

Maharashtra Transport Minister Pratap Sarnaik highlighted the transformative impact of the metro line on the region’s transportation landscape.

<p>The first trial run of Thane Metro 4 marks a significant milestone in the ongoing development of the city&rsquo;s rapid transit network.</p>

4/6

The first trial run of Thane Metro 4 marks a significant milestone in the ongoing development of the city’s rapid transit network.

<p>The trial was carried out on the stretch between Cadbury Junction and Kasarvadavali, which has now been completed and cleared for operational testing.</p>

5/6

The trial was carried out on the stretch between Cadbury Junction and Kasarvadavali, which has now been completed and cleared for operational testing.

<p>Chief Minister Devendra Fadnavis, along with Deputy Chief Minister Eknath Shinde, was also present during the first trial run.</p>

6/6

Chief Minister Devendra Fadnavis, along with Deputy Chief Minister Eknath Shinde, was also present during the first trial run.

Photo of Day

Breaking barriers and building pyramids — Women power in action!

Breaking barriers and building pyramids — Women power in action!

Sashastra Seema Bal’s (SSB) Daredevils team performs during rehearsals for the Republic Day Parade, in New Delhi. PIC/PTI

Advertisement