Home / Mumbai / Mumbai News / Videos / Elphinstone Bridge Demolition: High voltage drama at the bridge, JCB blocked

Elphinstone Bridge Demolition: High voltage drama at the bridge, JCB blocked

Updated On: 25 April, 2025 11:03 PM IST

Amid the ongoing chaos over the closure of the Elphinstone bridge, a tussle ensued between the authorities and the protesters over the closure of the bridge. The traffic department had announced that the bridge would officially close at 9 PM this was stalled due to protestors resistance. The barricades were stopped from being placed, the bulldozer was turned back as the protestors didn't let the proceedings to take place.

Latest Videos