Updated On: 05 July, 2014 06:54 AM IST | | Neha LM Tripathi
<p>The Rs 5,200-crore terminal, which started operations as recently as February 12, is already showing signs of wear and tear, with tiles coming undone at the arrival and departure sections</p>

T 2
The swanky Terminal 2 — better known as T2 — was inaugurated by then Prime Minister Dr Manmohan Singh on January 10 and flight operations started a month later.