Home / Mumbai / Mumbai News / Article / MMRDA begins work on DPR for Mumbai’s integrated tunnel road network

MMRDA begins work on DPR for Mumbai’s integrated tunnel road network

This visionary initiative aims to build a high-capacity, underground mobility corridor connecting the Mumbai Coastal Road, Bandra-Kurla Complex (BKC) High-Speed Rail Station (bullet train), and Chhatrapati Shivaji Maharaj International Airport Loop Connectivity

Listen to this article :
The tunnel network will be implemented in phased manner, guided by traffic requirements and future demand patterns. Representational Pic

The tunnel network will be implemented in phased manner, guided by traffic requirements and future demand patterns. Representational Pic

The Mumbai Metropolitan Region Development Authority (MMRDA) has initiated the process to prepare the Detailed Project Report (DPR) for the proposed Integrated Tunnel Road Network, marking a major step towards introducing Mumbai’s third mode of travel,  alongside the city’s expanding surface road and metro rail systems.

This visionary initiative aims to build a high-capacity, underground mobility corridor connecting the Mumbai Coastal Road, Bandra-Kurla Complex (BKC) High-Speed Rail Station (bullet train), and Chhatrapati Shivaji Maharaj International Airport Loop Connectivity, including decongestion of Western Express Highway and SV Road. Once operational, the tunnel network will significantly reduce traffic congestion, divert through-traffic underground, and reclaim valuable urban space for citizens.

Trending Stories

Latest Photoscta-pos

Latest VideosView All

Latest Web StoriesView All

Mid-Day FastView All

Advertisement
;