Updated On: 09 March, 2022 07:49 AM IST | Mumbai | Ranjeet Jadhav
MMRDA plans to open part of elevated BKC-WEH connector next month; project estimated to be completed later this year

The elevated section of the BKC-WEH connector is 1-km long
If all goes as per plan, motorists will be able to travel between BKC and Hyatt, Santacruz in less than 10 minutes from next month as the MMRDA plans to open a part of the elevated stretch of the Bandra Kurla Complex-Western Express Highway connector.
Mumbai Metropolitan Region Development Authority (MMRDA) Metropolitan Commissioner SVR Srinivas said, “Work on the BKC to WEH elevated connector is going on at a fast pace and we are hopeful of opening more than 1-km-long elevated section of the connector between Hyatt hotel, Santacruz and Raza Chowk near BKC for motorists by next month.”