Updated On: 08 February, 2025 12:54 AM IST | Mumbai | mid-day online correspondent
Trains departing CSMT from 10.58 am to 3.10 pm will be diverted on the Down Slow line at Matunga. These trains will halt as per their respective stations between Matunga and Mulund stations and will arrive at their destination 15 minutes late

Representational pic
Central Railway’s Mumbai Division will implement a Mega Block on Sunday to carry out essential engineering and maintenance work on its suburban sections. The block will affect services on both the fast and slow lines, as well as on the Harbour lines. The schedule for the Mega Block is as follows:
Matunga-Mulund UP and Down Fast Lines: 11.30 am to 3.30 pm