Home / Mumbai / Mumbai News / Article / Mumbai: Central Railway to operate mega block on April 14, check details

Mumbai: Central Railway to operate mega block on April 14, check details

On the main line, the mega block will be conducted from 11.00 am to 4.00 pm on Up and Down slow lines between Thane and Kalyan stations

Listen to this article :
Representational Image

Representational Image

The Mumbai Division of Central Railway, while sharing Mumbai local train updates, on Saturday said it will operate a mega block on its suburban sections to carry out various engineering and maintenance works. The block will be on the mainline and trans-harbour network, the Central Railway (CR) said in a statement.

On the main line, the mega block will be conducted from 11.00 am to 4.00 pm on Up and Down slow lines between Thane and Kalyan stations, the CR said.

Trending Stories

Latest Photoscta-pos

Latest VideosView All

Latest Web StoriesView All

Mid-Day FastView All

Advertisement