Updated On: 28 April, 2022 09:36 AM IST | Mumbai | Rajendra B. Aklekar
Old foot overbridge at elevated station will be undergoing repairs; passengers find the new bridge very useful

The foot underbridge connects both the platforms on the harbour line
In what could be termed a first, Mumbai railways now has a rail foot underbridge (FUB). Due to the peculiar design of the elevated Sandhurst Road station, the railways have built a foot underbridge, seamlessly connecting under both the platforms on the harbour line. The old regular foot overbridge at the elevated station is under repairs from today.
“The design is such that passengers can easily move between platform three and four of the harbour line without having to leave the railway premises. It is at the north end of the station and has been proving helpful to regular commuters,” a senior official said. The bridge that was opened earlier this year, is a connection under two rail lines and also has a staircase access wto the Wadibunder yard and road to P D’Mello Road exit.