Home / Mumbai / Mumbai News / Article / Monsoon preparations intensified by BMC, civic chief inspects desilting works

Monsoon preparations intensified by BMC, civic chief inspects desilting works

Gagrani directed the civic officials to dispose of silt extracted from nullahs (drains) within 48 hours at designated locations

Listen to this article :
With the onset of Mumbai monsoon nearing, BMC chief Bhushan Gagrani assured that the remaining works would be completed swiftly as per the scheduled plan. Pic/BMC

With the onset of Mumbai monsoon nearing, BMC chief Bhushan Gagrani assured that the remaining works would be completed swiftly as per the scheduled plan. Pic/BMC

The Brihanmumbai Municipal Corporation (BMC) has intensified its monsoon preparations in Mumbai and to review the ongoing works the chief chief Bhushan Gagrani visited several sites across the city, an official statement said on Thursday.

Gagrani directed the civic officials to dispose of silt extracted from nullahs (drains) within 48 hours at designated locations.

Trending Stories

Latest Photoscta-pos

Latest VideosView All

Latest Web StoriesView All

Mid-Day FastView All

Advertisement