Home / Mumbai / Mumbai News / Article / Panvel-Karjat Project: New local train line tunnel achieves another breakthrough

Panvel-Karjat Project: New local train line tunnel achieves another breakthrough

One more breakthrough was achieved last week on two of three tunnels on the new local train line of Panvel-Karjat project

Listen to this article :
The work on the longest tunnel is just 200m away from completion

The work on the longest tunnel is just 200m away from completion

With one more breakthrough last week, two of three tunnels on the new local train line of suburban corridor of Panvel-Karjat are now nearing completion with work on the longest tunnel just 200m away from completion.
 
The game changer Panvel-Karjat railway project is taking shape under MRVC’s Mumbai Urban Transport Project 3 (MUTP-3). A total of three tunnels (Total: 3,164m) i.e. Tunnel-1 (Nadhal Tunnel) of 219m, tunnel-2 (Wavrely tunnel) of 2,625m and Tunnel-3 (Kirawali Tunnel) of 320m are under construction as part of this project. 

The existing old line caters to goods and a few long-distance passenger trains. The new double line corridor will enable local trains to run between Mumbai to Karjat via Panvel. It will also work as a catalyst of the fast-developing Panvel, Karjat and NAINA (Navi Mumbai Airport Influence Notified Area).

Trending Stories

Latest Photoscta-pos

Latest VideosView All

Latest Web StoriesView All

Mid-Day FastView All

Advertisement