Updated On: 11 October, 2020 08:45 PM IST | Mumbai | Rajendra B Aklekar
Mumbai Ahmedabad High Speed Rail will traverse through Western Railways Ahmedabad Junction Railway Station and shall be integrated with Saraspur side of the existing Ahmedabad station.

Bullet Train
India’s bullet train project has caught up speed. The National High-Speed Rail Corporation Limited on Thursday invited bids for design and construction of about 18 km of viaduct between Anand and Sabarmati including HSR stations at Ahmedabad and Sabarmati for Mumbai Ahmedabad High Speed Rail corridor. The alignment also has 31 crossing bridges including 6 (six) Steel truss bridges.
“In last few days, NHSRCL has opened three (03) technical bids covering 64% (325 km out of 508 km) of the total MAHSR alignment including five (5) HSR stations (Vapi, Billimora, Surat, Bharuch and Anand/Nadiad) out of 12 stations,” a senior official said.