Updated On: 06 July, 2022 06:55 AM IST | Mumbai | The Editorial
Phase 1 of Metro Line 2A connecting Dahisar to Dahanukar Wadi and Metro Line 7 between Dahisar and Aarey were inaugurated on April 2. Operational for barely three months, the infrastructure seems to have already developed wear and tear

Buckets, as seen in the picture, are placed to collect rainwater leaking from the roof of Kandarpada Metro station
Metro lines 7 and 2A, which opened to the public recently, have leaky roofs, complained a commuter who shared with this paper photos of the leakage inside a compartment and at a station.
Phase 1 of Metro Line 2A connecting Dahisar to Dahanukar Wadi and Metro Line 7 between Dahisar and Aarey were inaugurated on April 2. Operational for barely three months, the infrastructure seems to have already developed wear and tear.