Home / Search / Mmrda

Mmrda

Mumbai Metro Pink Line-6 takes a major step forward as steel girders are installed on pillars near Jogeshwari railway station. The launch marks the beginning of crucial rail overbridge work over Western Railway on the 15.31-km elevated corridor connecting Swami Samarth Nagar to Vikhroli (EEH). PICS/SATEJ SHINDE

Updated 1 day ago

Work for launching the girders was carried out for nearly 10 hours from 10.15 pm on Saturday to 8.15 am on Sunday. PIC/SATEJ SHINDE

A 400-tonne crane toppled during Metro Line 2B construction at Mumbai’s BKC after a technical failure while lifting a beam. No injuries were reported. Authorities imposed traffic diversions and launched safety checks at the site. (Pic/Screengrab from X)

Updated 12 days ago

Work for launching the girders was carried out for nearly 10 hours from 10.15 pm on Saturday to 8.15 am on Sunday. PIC/SATEJ SHINDE
Advertisement