Home / Sports / Other Sports / Article /
First trial run on Versova-Ghatkopar metro line conducted
Updated On: 26 April, 2013 09:17 PM IST | | Ranjeet Jadhav
The first trial run to test the Versova-Ghatkopar metro tracks took place be on a short stretch of about 2.5 km from the car depot in Versova to Azad Nagar Metro station on Friday
Finally, the trail run of the much awaited Versova–Andheri Ghatkopar (VAG) metro line one took place on Friday evening on the 2-2.5 km stretch between the metro car depot at Indian Oil and Azad Nagar Station.
Confirming the same, MMRDA Additional Metropolitan Commissioner SVR Srinivas said, “A lot of leg work has gone into the construction of VAG metro rail corridor and it feels great to announce that the trail run on the 2-2.5 km stretch between the car depot and Azad Nagar which was done on Friday evening was successful. Traveling in the metro was a very good experience and now we are concentrating on completing the work on the entire corridor at the earliest so that people can enjoy the ride.”


